KYTC PANBOWL LAKE (KY-15)

Location:

JACKSON, KY

Client:

Kentucky Transportation Cabinet (KYTC)

Background

In February of 2021, the city of Jackson, KY experienced severe flooding that elevated the Kentucky River and Panbowl Lake to dangerous levels. The flood waters nearly overflowed the Panbowl Lake Dam which serves as a foundation for the Kentucky Highway 15 roadway. Additionally, the flooding led to erosion and stability issues for the slope of the dam. Over 12,000 vehicles cross this section of the Kentucky 15 Highway daily, so the Kentucky Transportation Cabinet (KYTC) had to act quickly to address the issue.

Schnabel’s Solution

In November of 2022, Schnabel was awarded this project as a General Contractor working for the Kentucky Transportation Cabinet (KYTC) and the state of Kentucky along Kentucky Highway 15. The main objective of the project revolved around the design and installation of a permanent secant pile water cutoff wall for the Panbowl Lake Dam in Jackson, KY.

Schnabel drilled over 150 secant pile shafts, covering a length of 7505 linear feet. The shafts had a diameter of 1,180mm, and their drilling depth reached 53 feet. Throughout the process, core drilling and permeability tests were performed at regular intervals, ensuring the highest quality of work. To assess the structural integrity and impermeability of the drilled shafts, four Crosshole Sonic Logging (CSL) tests were performed.

Results

The client for this project had urgent requirements due to the pressing need to mitigate lakeside flooding incidents promptly and prepare for the upcoming expansion of Kentucky Highway 15. Schnabel took on the challenge of meeting an aggressive schedule by implementing comprehensive pre-planning measures and dedicated overtime work. Understanding the critical importance of acting swiftly, Schnabel leveraged its expertise and resources to ensure that the project progressed efficiently. By adopting a proactive approach, Schnabel effectively contributed to the prevention of further lakeside flooding incidents. At the same time, the preparations made for widening Kentucky Highway 15 served as an essential foundation for future development and enhanced infrastructure in the region.

In June 2023, Schnabel successfully installed a permanent secant pile water cutoff wall for the Panbowl Lake Dam in Jackson, KY. Despite facing an aggressive schedule, Schnabel’s expertise allowed them to complete the project ahead of the projected timeline, under budget, and with an exemplary safety record—no incidents to report. The completion of this vital project marks a significant step forward in safeguarding the region against potential lakeside flooding incidents. The secant pile water cutoff wall, constructed by Schnabel, will help to prevent any future damage to the Panbowl Lake Dam. The successful outcome of this project will have a lasting positive impact on the community it serves and the environment it protects.

Quick Facts

Location

Jackson, Kentucky

Client

Kentucky Transportation Cabinet (KYTC)

Market

Transportation

Work Performed

Secant cutoff wall

Completion Date

June 2023

Duration

8 Months

Contract Value

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Quick Facts

Location

Client

Market

Work Performed

Completion Date

Duration

Contract Value

Jackson, Kentucky

Kentucky Transportation Cabinet (KYTC)

Transportation

Secant cutoff wall

June 2023

8 Months

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Related Projects

Key Contacts:

David Vega Sanchez | PM, Pre-Con

Key Contacts:

German Varon | Sr. PM, Pre-Con

Ernie Brandl | Sr. PM, Pre-Con

Key Contacts:

Ryan Whaley | Sr. PM, Pre-Con

Kristopher Knier | Sr. PM, Pre-Con

Brendan Sheppard | Sr. PM, Pre-Con

Key Contacts:

Claus Ludwig | Sr. PM, Pre-Con

Key Contacts:

Mark Goudschaal | Sr. PM, Pre-Con

Key Contacts:

Sue Wright | Sr. PM, Pre-Con

Harold Gathers | Sr. PM, Pre-Con

Key Contacts:

Sixto Fernandez | Mid-Atlantic Area Manager

Rich Pratt | Sr. PM, Pre-Con

Taylor Youngwood | PM, Pre-Con

Key Contacts:

Josh Fallon | Sr. PM, Pre-Con

Key Contacts:

Michael Patzek | Business Development Manager