DENVER HEALTH ACOMA GARAGE

Location:

DENVER, CO

Client:

Turner Construction

Background

As part of the Denver Health and Hospital Campus expansion, a 7-story parking garage with one below-grade level was constructed to meet parking demands. Several buildings were demolished to make way for the new garage, except for one located just 3 feet from the new structure. The garage foundations extended up to 6 feet below the adjacent building’s foundation, requiring careful support to prevent damage.

Schnabel’s Solution

To protect the nearby building, Schnabel implemented Soil Mix Pier Underpinning (SMPU). Along 171 linear feet of the building, 36 underpinning pits were excavated, each 5 feet wide and up to 7 feet deep. Because the building’s footing was 3 feet lower than the interior slab, Schnabel accounted for added soil loading and reinforced the SMPU pits by drilling soil anchors approximately 1 foot below the footing. Grout was carefully injected through the footing to eliminate any voids that could cause settlement.

Results

The SMPU system successfully stabilized the adjacent building, preventing damage during garage construction. Toward the project’s end, Schnabel also addressed an unforeseen challenge: a shallower-than-expected retaining wall on the opposite side of the garage. To secure this area, 8 additional underpinning pits, 5–7 feet deep, were installed to support both the retaining wall and part of the adjacent alleyway. The work ensured safe excavation and structural stability for the entire site.

Quick Facts

Location

Denver, Colorado

Client

Denver Health and Hospital Authority

Market

Healthcare

Work Performed

Soil mix pier underpinning

Completion Date

--

Duration

--

Contract Value

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Quick Facts

Location

Client

Market

Work Performed

Completion Date

Duration

Contract Value

Denver, Colorado

Denver Health and Hospital Authority

Healthcare

Soil mix pier underpinning

--

--

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Related Projects

Key Contacts:

David Vega Sanchez | PM, Pre-Con

Key Contacts:

German Varon | Sr. PM, Pre-Con

Ernie Brandl | Sr. PM, Pre-Con

Key Contacts:

Ryan Whaley | Sr. PM, Pre-Con

Kristopher Knier | Sr. PM, Pre-Con

Brendan Sheppard | Sr. PM, Pre-Con

Key Contacts:

Claus Ludwig | Sr. PM, Pre-Con

Key Contacts:

Mark Goudschaal | Sr. PM, Pre-Con

Key Contacts:

Sue Wright | Sr. PM, Pre-Con

Harold Gathers | Sr. PM, Pre-Con

Key Contacts:

Sixto Fernandez | Mid-Atlantic Area Manager

Rich Pratt | Sr. PM, Pre-Con

Taylor Youngwood | PM, Pre-Con

Key Contacts:

Josh Fallon | Sr. PM, Pre-Con

Key Contacts:

Michael Patzek | Business Development Manager