Background

The project involved the installation of three secant shafts to support the construction of the city’s main sewer line, which transports wastewater to the Boulder Water Resource Recovery Facility. The shafts would provide general contractor, BT Construction with access for a Mini Tunnel Boring Machine (TBM) to install a portion of the sanitary sewer line.

Schnabel’s Solution

BT Construction contracted with Schnabel to install 84 individual secant shafts, which involved 2,892 vertical feet (VF) of drilling using a Bauer BG28. The project featured two receiving shafts, each with a 20-foot diameter and varying excavation depths: one shaft reached 33 feet deep, while the other extended to 28 feet. The third shaft was a 33-foot diameter launch shaft, with an excavation depth of 28 feet.

Results

Schnabel planned each rig mobilization carefully to minimize traffic disruption. One mobilization occurred overnight to ensure safety and reduce impact.

Quick Facts

Location

Boulder, Colorado

Client

City of Boulder / BT Construction

Market

Wastewater

Work Performed

Secant shaft installation

Completion Date

2024

Duration

--

Contract Value

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Quick Facts

Location

Client

Market

Work Performed

Completion Date

Duration

Contract Value

Boulder, Colorado

City of Boulder / BT Construction

Wastewater

Secant shaft installation

2024

--

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Related Projects

Key Contacts:

David Vega Sanchez | PM, Pre-Con

Key Contacts:

German Varon | Sr. PM, Pre-Con

Ernie Brandl | Sr. PM, Pre-Con

Key Contacts:

Ryan Whaley | Sr. PM, Pre-Con

Kristopher Knier | Sr. PM, Pre-Con

Brendan Sheppard | Sr. PM, Pre-Con

Key Contacts:

Claus Ludwig | Sr. PM, Pre-Con

Key Contacts:

Mark Goudschaal | Sr. PM, Pre-Con

Key Contacts:

Sue Wright | Sr. PM, Pre-Con

Harold Gathers | Sr. PM, Pre-Con

Key Contacts:

Sixto Fernandez | Mid-Atlantic Area Manager

Rich Pratt | Sr. PM, Pre-Con

Taylor Youngwood | PM, Pre-Con

Key Contacts:

Josh Fallon | Sr. PM, Pre-Con

Key Contacts:

Michael Patzek | Business Development Manager