GALLATIN COUNTY SLIDE REPAIR

Location:

WARSAW, KY

Client:

Kentucky Transportation Cabinet (KYTC)

Background

On June 9, 2021, Schnabel was awarded the $18M Gallatin County Slide Repair project as the prime contractor for the Kentucky Transportation Cabinet (KYTC) Department of Highways. The project is a 1.25 mile-long reconstruction of U.S. 42 located roughly half way between Cincinnati, Ohio and Louisville, Kentucky. U.S. 42 is a two-lane scenic highway which runs along the Ohio River. This section of the highway has been prone to landslides since it was built. Work began on the project in November of 2021.

As part of the Gallatin County Slide Repair project, Schnabel is constructing a 0.6 mile long tieback retaining wall to help stabilize the existing landslides. Schnabel designed the wall using KYTC apparent earth pressure and toe embedment parameters. The wall has one to two-tiers of tiebacks with 385 double wide-flange soldier beams, 540 each 10-strand fully encapsulated tiebacks, 75,000 square feet of temporary lagging, and 65,000 square feet of precast concrete panels.

Schnabel’s Solution

Construction of the project required that the section of road affected by construction be closed resulting in customers of local businesses no longer being able to conveniently reach their destination as well as other economic/emergency impacts. Schnabel negotiated a $1.4 million lump sum incentive with a $10,000 per calendar day disincentive agreement with KYTC to open up two-way traffic by Memorial Day 2023 - six months earlier than the original plan. Any remaining work after that date, including precast panel installation, will be completed after the road is reopened. To accomplish this incentive, Schnabel needed to allocate more resources as well as re-evaluate the schedule to include additional shifts to ensure that this initiative is achieved.
Schnabel experienced several complex challenges on this project. During the utility relocation work, the landslide continued to move, resulting in additional displacements of around one inch per month prior to the soldier beam installation. In addition, the lack of suitable survey control points made it difficult to monitor landslide movements.

Results

Schnabel installed all the soldier beams, tiebacks and wood lagging for the project. Schnabel’s primary subcontractors are Dudley Construction (excavation, traffic control and utilities), Hinkle Contracting (paving), Hayes Drilling (soldier beam drilling), and Terracon (tieback quality control). This project along with our discussions with KYTC and their consultants, LOCHNER & STANTEC, helped Schnabel secure two additional KY contracts, Panbowl Lake Dam and U.S. 460, totaling $7.23M.

Quick Facts

Location

Warsaw, Kentucky

Client

Kentucky Transportation Cabinet (KYTC)

Market

Transportation

Work Performed

Tieback wall construction

Completion Date

January 2023

Duration

14 Months

Contract Value

$18 Million

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Quick Facts

Location

Client

Market

Work Performed

Completion Date

Duration

Contract Value

Warsaw, Kentucky

Kentucky Transportation Cabinet (KYTC)

Transportation

Tieback wall construction

January 2023

14 Months

$18 Million

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Related Projects

Key Contacts:

David Vega Sanchez | PM, Pre-Con

Key Contacts:

German Varon | Sr. PM, Pre-Con

Ernie Brandl | Sr. PM, Pre-Con

Key Contacts:

Ryan Whaley | Sr. PM, Pre-Con

Kristopher Knier | Sr. PM, Pre-Con

Brendan Sheppard | Sr. PM, Pre-Con

Key Contacts:

Claus Ludwig | Sr. PM, Pre-Con

Key Contacts:

Mark Goudschaal | Sr. PM, Pre-Con

Key Contacts:

Sue Wright | Sr. PM, Pre-Con

Harold Gathers | Sr. PM, Pre-Con

Key Contacts:

Sixto Fernandez | Mid-Atlantic Area Manager

Rich Pratt | Sr. PM, Pre-Con

Taylor Youngwood | PM, Pre-Con

Key Contacts:

Josh Fallon | Sr. PM, Pre-Con

Key Contacts:

Michael Patzek | Business Development Manager