San Marcos River ARWA Tunnel Shafts

Location:

Martindale, TX

Client:

SJ Louis Construction

Background

Two circular access shafts were required for a water supply tunnel project along the San Marcos River. The shafts needed to provide safe and stable access for tunnel construction while navigating variable subsurface conditions and ensuring minimal disturbance to surrounding areas.

Schnabel’s Solution

Schnabel designed and constructed the shafts using overlapping secant piles filled with unreinforced concrete—42 piles to 69 ft for the launching shaft and 24 piles to 58 ft for the receiving shaft. Specialized Bauer drill rigs with 1180 mm casing ensured precise alignment and verticality, providing stable excavation support for tunnel construction.

Results

The secant pile shafts provided stable, safe access for tunnel construction and maintained structural integrity throughout excavation. Schnabel’s efficient installation minimized subsurface disturbance and ensured the project remained on schedule.

Quick Facts

Location

Martindale, Texas

Client

Alliance Water

Market

Water

Work Performed

Secant pile shafts

Completion Date

October 2023

Duration

4 Months

Contract Value

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Quick Facts

Location

Client

Market

Work Performed

Completion Date

Duration

Contract Value

Martindale, Texas

Alliance Water

Water

Secant pile shafts

October 2023

4 Months

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Related Projects

Key Contacts:

David Vega Sanchez | PM, Pre-Con

Key Contacts:

German Varon | Sr. PM, Pre-Con

Ernie Brandl | Sr. PM, Pre-Con

Key Contacts:

Ryan Whaley | Sr. PM, Pre-Con

Kristopher Knier | Sr. PM, Pre-Con

Brendan Sheppard | Sr. PM, Pre-Con

Key Contacts:

Claus Ludwig | Sr. PM, Pre-Con

Key Contacts:

Mark Goudschaal | Sr. PM, Pre-Con

Key Contacts:

Sue Wright | Sr. PM, Pre-Con

Harold Gathers | Sr. PM, Pre-Con

Key Contacts:

Sixto Fernandez | Mid-Atlantic Area Manager

Rich Pratt | Sr. PM, Pre-Con

Taylor Youngwood | PM, Pre-Con

Key Contacts:

Josh Fallon | Sr. PM, Pre-Con

Key Contacts:

Michael Patzek | Business Development Manager