Geotechnical Solutions for Waterfront, Port, Dam, and Levee Projects Nationwide

Schnabel delivers innovative and reliable geotechnical solutions for waterfront, port, dam, and levee projects, ensuring long-term stability and safety in complex environments.

Schnabel is a nationwide design-build contractor specializing in geotechnical design and construction services for waterfront, port, dam, and levee projects. With decades of specialized experience, we provide tailored, site-specific solutions for some of the most complex infrastructure projects across the country.

Earth Retention Services for Waterfront,
Port, Levee, and Dam Projects

Construction in waterfront, port, levee, and dam environments requires deep technical expertise and specialized equipment. Schnabel brings a proven track record in providing advanced earth retention systems designed to meet the unique challenges of these projects. We provide services for:
Waterfront Infrastructure

Waterfront Infrastructure

Port and Harbor Developments

Port and Harbor Developments

Dam and Levee Construction

Dam and Levee Construction

Flood Control Projects

Flood Control Projects

Geotechnical Support for Waterfront, Dam, and Levee Projects

We offer a full range of geotechnical services tailored to waterfront, port, and dam projects:

Permanent Tiebacks

Stabilize existing bulkheads, ensuring long-term structural integrity and safety.

Tied-Back Cut-Off Walls

Facilitate the construction of new or expanded bulkheads and ports to support waterfront projects.

Excavation Support Systems

Enable the safe construction of underground structures and abutments in complex environments.

Cut-Off Walls

Control seepage in dam and levee structures, enhancing stability and water management.

Tieback Anchors

Improve safety and stability by providing additional resistance against overturning forces, essential in waterfront settings.

Ready to Overcome Your Waterfront, Dam, or Levee Challenges? Let’s Talk.

Why Schnabel?

Schnabel’s specialized equipment allows us to perform tieback installations directly over water — eliminating the need for boats or barges. This approach makes construction safer and more efficient in challenging waterfront environments. With our design-build capabilities and vast experience in complex geotechnical conditions, we are a trusted partner for waterfront, dam, and levee projects nationwide.

Partner with Schnabel for your waterfront infrastructure project
From design to completion, Schnabel ensures safe, cost-effective, and long-lasting solutions for your infrastructure needs.

Real-World Results in Waterfront, Dam, and Levee Projects

Proven Expertise in Critical Infrastructure

Schnabel has delivered geotechnical solutions for many of the country’s most demanding waterfront, port, and levee infrastructure projects. Here’s a look at some of our impactful work:

Interstate 275/State Route 93

Location:

Tampa Bay, FL

Client:

Ebsary Foundation
Company

Background

FDOT is undertaking a multi-phase project along I-275 over Old Tampa Bay, including the new Howard Franklin Bridge, road expansions, and new pedestrian/cycling paths. This work will improve connectivity and reduce congestion in the growing Tampa Bay region.

Schnabel’s Solution

Schnabel was contracted to provide earth retention services for 5,500 feet of newly reclaimed land. Schnabel installed over 1,100 pairs of sheet piles and 534 tiebacks, supported by extensive testing.

Results

Schnabel delivered the project three months ahead of schedule, enabling FDOT to move forward with new lanes and pedestrian pathways to enhance mobility across Tampa Bay.

Panbowl Lake (KYTC)

Location:

Jackson, KY

Client:

Kentucky Transportation Cabinet (KYTC)

Background

severe flooding in Jackson, KY elevated the Kentucky River and Panbowl Lake to dangerous levels, nearly overtopping the Panbowl Lake Dam, which also supports Highway 15. With over 12,000 vehicles crossing daily, KYTC needed an urgent solution to stabilize the dam and prepare for future highway expansion.

Schnabel’s Solution

Schnabel served as General Contractor to design and install a permanent secant pile water cutoff wall. The team drilled more than 150 shafts (7,505 linear feet), each 1,180mm in diameter and up to 53 feet deep. Core drilling, permeability checks, and CSL testing ensured structural integrity and water cutoff performance.

Results

Schnabel completed the secant pile cutoff wall ahead of schedule, under budget, and with zero safety incidents. The project safeguards the community from future flooding risks while supporting critical infrastructure improvements along Highway 15.

Ready to Build Resilient Waterfront Infrastructure? Let’s Connect.

Partner with Schnabel for innovative, geotechnical solutions that ensure the stability and safety of your waterfront, dam, or levee project.

Key Contacts:

David Vega Sanchez | PM, Pre-Con

Key Contacts:

German Varon | Sr. PM, Pre-Con

Ernie Brandl | Sr. PM, Pre-Con

Key Contacts:

Ryan Whaley | Sr. PM, Pre-Con

Kristopher Knier | Sr. PM, Pre-Con

Brendan Sheppard | Sr. PM, Pre-Con

Key Contacts:

Claus Ludwig | Sr. PM, Pre-Con

Key Contacts:

Mark Goudschaal | Sr. PM, Pre-Con

Key Contacts:

Sue Wright | Sr. PM, Pre-Con

Harold Gathers | Sr. PM, Pre-Con

Key Contacts:

Sixto Fernandez | Mid-Atlantic Area Manager

Rich Pratt | Sr. PM, Pre-Con

Taylor Youngwood | PM, Pre-Con

Key Contacts:

Josh Fallon | Sr. PM, Pre-Con

Key Contacts:

Michael Patzek | Business Development Manager