PORT OF MIAMI NEW NORTH BERTH 7

Location:

MIAMI, FL

Client:

Ebsary Foundation Company

Background

In 2018, Royal Caribbean, a global cruise company, began an expansion project to construct new cruise terminals in the Port of Miami, recognized as the cruise capital of the world. This port is a major hub located in Biscayne Bay at the mouth of the Miami River in Miami, Florida, which plays a pivotal role in maritime activities. The upcoming terminals will feature docking facilities designed to accommodate large cruise ships from around the world, establishing a central hub for select cruise ships. This project aims to meet the escalating demands of the growing cruise industry, which annually serves millions of passengers.

Schnabel’s Solution

In November of 2017, Schnabel was contracted by Ebsary Foundation Company to install 63 permanent tiebacks to support the construction of the new North Berth 7 Cruise Terminal. Schnabel installed 4,600 linear feet of tiebacks, some reaching lengths of up to 80 feet. The tiebacks were designed with a maximum capacity of 230 KIPS, ensuring structural stability and integrity.

Schnabel successfully navigated through the steel and concrete obstacles found in the project by employing specialized coring tools and equipment from Schnabel’s Equipment Division. Much of the drilling was conducted from a barge situated in a busy port section with heavy ship traffic. Despite the challenges posed by the wakes of passing ships and tide changes. Schnabel’s crew devised creative solutions to secure the barge to the berth while maintaining flexibility in moving quickly between different work areas.

Results

In conclusion, Schnabel successfully installed 63 permanent tiebacks to support the construction of a new cruise terminal in the Port of Miami. Overcoming challenges with creativity and utilizing specialized equipment from their equipment division and R&D department, Schnabel completed the project on time and to the satisfaction of the client. Special thanks to everyone involved in this challenging project.

Quick Facts

Location

Miami, Florida

Client

Royal Caribbean

Market

Marine

Work Performed

Permanent tiebacks

Completion Date

2018

Duration

--

Contract Value

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Quick Facts

Location

Client

Market

Work Performed

Completion Date

Duration

Contract Value

Miami, Florida

Royal Caribbean

Marine

Permanent tiebacks

2018

--

--

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Lorem ipsum, consectetur adipiscing

Related Projects

Key Contacts:

David Vega Sanchez | PM, Pre-Con

Key Contacts:

German Varon | Sr. PM, Pre-Con

Ernie Brandl | Sr. PM, Pre-Con

Key Contacts:

Ryan Whaley | Sr. PM, Pre-Con

Kristopher Knier | Sr. PM, Pre-Con

Brendan Sheppard | Sr. PM, Pre-Con

Key Contacts:

Claus Ludwig | Sr. PM, Pre-Con

Key Contacts:

Mark Goudschaal | Sr. PM, Pre-Con

Key Contacts:

Sue Wright | Sr. PM, Pre-Con

Harold Gathers | Sr. PM, Pre-Con

Key Contacts:

Sixto Fernandez | Mid-Atlantic Area Manager

Rich Pratt | Sr. PM, Pre-Con

Taylor Youngwood | PM, Pre-Con

Key Contacts:

Josh Fallon | Sr. PM, Pre-Con

Key Contacts:

Michael Patzek | Business Development Manager